DAGUAJI

HUAQUAN / WEICHAI

Huaquan diesel generators

Weichai engines · 30 / 80 / 200 kW

Backup power for civilian buildings, small businesses and project sites. DAGUAJI coordinates specification, sourcing and cross-border delivery.

DAGUAJI canopy concept | Not a Huaquan product photograph. Structure, cooling and custom branding require manufacturer approval.

DAGUAJI canopy concept | Not a Huaquan product photograph. Structure, cooling and custom branding require manufacturer approval.

Open-frame / 开架式实物 / Открытое исполнение

Huaquan HQ30GF Weichai diesel generator

HQ30GF

Prime power
30 kW / 37.5 kVA
Standby power
33 kW
Engine
Weichai WP2.3D40E200
Alternator
Huaquan HQF-30
Voltage
230/400V · 50 Hz
rpm
1500
Fuel tank
80 L
DAGUAJI canopy concept | Not a Huaquan product photograph. Structure, cooling and custom branding require manufacturer approval.

DAGUAJI canopy concept | Not a Huaquan product photograph. Structure, cooling and custom branding require manufacturer approval.

Open-frame / 开架式实物 / Открытое исполнение

Huaquan HQ80GF Weichai diesel generator

HQ80GF

Prime power
80 kW / 100 kVA
Standby power
88 kW
Engine
Weichai WP4.1D100E200
Alternator
Huaquan HQF-80
Voltage
230/400V · 50 Hz
rpm
1500
Fuel tank
200 L
DAGUAJI canopy concept | Not a Huaquan product photograph. Structure, cooling and custom branding require manufacturer approval.

DAGUAJI canopy concept | Not a Huaquan product photograph. Structure, cooling and custom branding require manufacturer approval.

Open-frame / 开架式实物 / Открытое исполнение

Huaquan HQ200GF Weichai diesel generator

HQ200GF

Prime power
200 kW / 250 kVA
Standby power
220 kW
Engine
Weichai WP10D264E200
Alternator
Huaquan HQF-200
Voltage
230/415V · 50 Hz
rpm
1500
Fuel tank
500 L

Available options

Acoustic weather canopy, ATS, coolant preheater, diesel-fired jacket heater, oil heater and spare parts. Options selected for site conditions.

Supply & technical notes

Indicative production: 10–15 working days after deposit, subject to order confirmation. Manufacturer warranty: 12 months or 1,000 operating hours, whichever comes first; scope and local service require written confirmation.

Cold starting requires verification of site temperature, fuel and preheating. No corresponding cold-temperature test report has been supplied; this is not a −25°C performance guarantee. Destination conformity documents are checked for the exact model and project.

Source: manufacturer documents dated 9 October 2026. Manufacturer-supplied images illustrate the corresponding models. Final configuration follows the agreed technical specification.

Request a quotation WhatsApp +86 181 2932 9999